After a week of delays last week, it was good to get cracking with the Decking and Veggie Patch Project This week. With a bit of in different weather progress has been good.
27 Stump holes dug, 19 stumps concreted in and 8 retaining wall posts installed. 17 Sleepers fitted creating 4 great sized veggie beds, which will be flowing off of the new decking area. Here's to a good week of weather to speed things along.