Another Tough Week, but progress.

After a week of delays last week, it was good to get cracking with the Decking and Veggie Patch Project This week.  With a bit of in different weather progress has been good. 

27 Stump holes dug, 19 stumps concreted in and 8 retaining wall posts installed. 17 Sleepers fitted creating 4 great sized veggie beds, which will be flowing off of the new decking area.  Here's to a good week of weather to speed things along.